Request an inspection520-820-3522HammerHead BlueLight UV
CONTROLLED LIGHT.
DOCUMENTED CURE.
UV curing delivers a fast, controlled structural result with recorded installation data for project documentation.
Measured from start to finish
CURE DATA IN.
GUESSWORK OUT.
HammerHead BlueLight technology cures a resin-saturated structural liner with precisely controlled ultraviolet light. The system records key installation information so our team can verify the curing process instead of relying on ambient conditions or assumptions.
Its modular equipment supports small-diameter branch piping and larger-diameter sewer applications while reducing downtime in homes, commercial facilities and occupied buildings.
HammerHead technology
SEE BLUELIGHT
IN ACTION.
See how the HammerHead BlueLight system uses automated, controlled LED curing to rehabilitate sewer and drain pipelines with speed and documented precision.
Start with certainty
LET’S SEE WHAT’S
REALLY GOING ON.
Request a pipeline inspection or second opinion from Tucson’s rehabilitation specialists.
Request an inspection