Technology & equipment

THE RIGHT EQUIPMENT.
IN TRAINED HANDS.

Pipeline rehabilitation is only as reliable as the inspection, preparation, installation and verification behind it.

GUESSWORK OUT.
CONTROL IN.

LINERWORX brings specialized equipment to the project so every major step can be performed and documented by one accountable team.

01

HammerHead BlueLight UV

Controlled UV curing for small- and larger-diameter structural liners with recorded installation data.

Explore technology
02

Robotic Cutting System

Camera-guided cutting removes internal obstructions and reopens branch connections after lining.

Explore technology
03

Picote Milling Equipment

Mechanical descaling, cleaning and root removal rebuild the host-pipe profile before rehabilitation.

Explore technology
04

CCTV Inspection Systems

High-resolution video inspection and locating establish actual pipe condition before and after work.

Explore technology
05

Hydro-Jetting Equipment

High-pressure water removes grease, roots and debris while flushing the prepared system clean.

Explore technology
06

CIPP Installation Systems

Specialized inversion and curing systems install structural liners across a range of pipe sizes.

Explore technology

LET’S SEE WHAT’S
REALLY GOING ON.

Request a pipeline inspection or second opinion from Tucson’s rehabilitation specialists.

Request an inspection